PROJECT-CONCEPT of investment (commercial) projects

150 €/100 м²

Included:

  • Architectural solution (up to 2 variants);
  • Necessary cuts;
  • Visualization of appearance;
  • Technical and economic indicators;
  • The layout of the general plan (zoning of the territory, location of the building)

Urban-planning with technical and economic indicators

1200 €/project

Included:

  • Box “ARCHITECTURAL SKETCH PROJECT”;
  • Calculation and justification of the parameters and location of the building;
  • Technical and economic indicators;
  • The project “Urban-planning conditions and land development restrictions”

ADVANTAGES OF IMPLEMENTATION OF INVESTMENT PROJECTS IN OUR COMPANY “AIK” KREATIV “,

in that by prior arrangement we take the Project and its implementation for full management, the costs for all can be stipulated in the complex (project, author supervision and implementation management, general contract for construction).

DESIGN WORKING DOCUMENTATION

Stage “Project” (P)

Cost according to the estimate for design work

Included:

Section “Explanatory note”
Section “General plan. Summary plan of engineering networks »
Section “Architectural solutions”
Section “Construction Constructions”
Section “Technological solutions”
Section “Plumbing and sewerage”
Section “External water supply and sewerage networks, in-site”
Section “Heating, ventilation, air conditioning”
Section “Pumping station of household-drinking water supply with tanks”
Section “Wastewater treatment plants”
Section “Wastewater Treatment Plant”
Section “Electrical solutions”
Section “Thermal-mechanical solutions of boiler-house”
Section “Fire Alarm System”
Section “Fire Alarm and Human Evacuation Management System”
Section “Water Extinguishing System”
Section “Internal fire water supply system”

The “Project” stage is a project that is submitted for inspection to the State Construction Expertise, therefore, depending on the nature of the object, this list is adjusted in accordance with the specific purpose of the facility

Stage “Working documentation” (W)

Cost according to the estimate for design work

Included:

Section “General plan, improvement, engineering networks”
Section “Architectural part”
Section “Decision of interiors”
Section “Technological part”
Section “Reinforced concrete structures”
Section “Metal constructions”
Section “Water supply and sanitation (internal)”
Section “Intrasite networks of water supply and sanitation”
Section “Wastewater treatment plants”
Section “Rainwater effluent treatment”
Section “Reservoirs of water supply”
Section “Pump station for water supply”
Section “Heating, ventilation, air conditioning”
Section “Compressed air networks”
Section “Boiler room (thermal mechanical part)”
Section “Boiler house automation”
Section “Electro-supply”
Section “Electrical solutions”
Section “Electric lighting external”
Section “Fire Alarm System”
Section “Smoke protection system”
Section “Internal fire water supply system”
Section “Voice announcement system”
Section “Lightning protection”
Section “Water Extinguishing System”
Section “External Fire Water Supply System”
Section “Gas fire-fighting system server”
Section “Fire protection of metal constructions of stairs”
Section “Fire-fighting system for kitchen equipment”
Section “Development of technical specifications and working draft of the system for early detection of emergencies and alerting people in the event of their detection”
Section “Engineering and technical measures of civil defense. Technogen security »
Section “Consolidated Estimate”

Stage “Working documentation” is a project according to which construction works are conducted, therefore, depending on the nature of the object, this list is adjusted in accordance with the specific purpose of the object

For investment objects, the design cost is calculated in accordance with the state building codes and price lists, is agreed upon additionally. The calculation is carried out in the licensed program “СМЕТА-ПИР”.

To order the development and implementation of the project, please call +38 (067) 576 2162